Every IEC 61851-23 Annex CC.7.5 test case at TÜV Rheinland, including the hard tests at full power
At the Power Test Center Cologne, TÜV Rheinland covers photovoltaics, power electronics and many other fields. For electric mobility, the team wanted to offer EVSE manufacturers the complete DC charging test scope in its own lab.

The configuration
- EV and EVSE simulation for CCS1 and CCS2
- Man-in-the-middle between vehicle and charger
- Up to 1,000 V and 500 A for DC charging
- AC fault insertion and AC measurement up to 64 A
- Test libraries: IEC 61851-23 and -1, ISO 15118-4 and -5
One institute, many test fields
Test institutes are asked to cover a wide range of products. Our customer in this project, TÜV Rheinland Products, tests photovoltaic systems, power electronics and further technologies at the Power Test Center Cologne. Charging infrastructure is one part of that portfolio.
The goal
The team wanted to offer EVSE manufacturers the complete DC charging test scope in its own lab: every IEC 61851-23 Annex CC.7.5 test case, including the hard tests at full power. IEC 61851-23 defines the requirements for DC charging stations. The lab needed a system that acts as the vehicle, and that can also sit between vehicle and charge point.
The system
The EVCA-based setup consists of two racks, one of them for IEC 61851-23 tests. It covers AC and DC charging with CCS1 and CCS2 (Combo 1 and 2). Its main applications are EV simulation and man-in-the-middle.
Technical data in short
- Man-in-the-middle: 1,000 V, 500 A
- EV simulation: 1,000 V, 500 A, with AC fault insertion
- EVSE simulation: 1,000 V, 500 A
- AC measurement: 230 V L-N (three-phase), 64 A
The maximum values result from the weakest component in each path: inlet, connector and the measurement or simulation unit involved.
Test libraries for EVSE testing
- IEC 61851-23
- IEC 61851-1
- ISO 15118-4
- ISO 15118-5
comframe Release 1.6.0 brings the first 82 ISO 15118-21 test cases for charging stations, available from early November 2026. ISO 15118-23 is coming soon.
What this means for a lab
A lab with many test fields needs equipment that does not take over the whole room. Here, EV simulation, man-in-the-middle and standard-based test libraries come in two racks. AC and DC charging are covered with the same connectors, CCS1 and CCS2.
What this means for manufacturers
Charge point manufacturers can check their products against the standards in one lab, for AC and DC, while the institute covers their other test needs as well.
Testing as part of development
Roman Brück heads the Power Test Center Cologne. In an interview with TÜV Rheinland (in German), he describes where labs are heading. In his view, testing should not be a bureaucratic hurdle at the end of development, but support across different development phases.
We see it the same way. Our roots are in automotive, where the V-model makes testing part of development. The earlier a team tests, the earlier it finds what to fix, and the cheaper the fix.
Interested in a similar setup?
Talk to our engineers about your test scope and standards.