Standards & Knowledge
Brochures, Webinars and Technical Resources
Start with an explanation, follow a practical test example or open a technical specification. Use the filters to find material for your charging or BMS application.

Explore the original documents for the system you are evaluating. Each cover opens its corresponding English PDF.
Brochures and technical datasheets
These documents and guides represent the most direct entry points for current MCS, EMC, field, charging-platform and BMS test decisions.

EV Charging Analyzer
Explore the EVCA platform for EV, EVSE and interoperability testing.
Open brochure ↗
EVCA ComOnly
Review the communication tester for EVCC and SECC development.
Open brochure ↗
MCS technical datasheet
Review the dedicated MCS system and its technical configuration.
Open datasheet ↗
EMC Link
Connect supported charging signals across the EMC chamber boundary.
Open brochure ↗
Battery Cell Simulator
Compare cell, sensor, balancing and fault simulation for BMS testing.
Open brochure ↗
Easy Chester Calimera
Explore charging-station calibration under load in the field.
Open brochure ↗
Easy Chester Ultimate
Explore guided charging and electrical-safety tests in one field workflow.
Open brochure ↗
Easy Chester Ultimate technical datasheet
Check interfaces, measurements, test options and operating conditions.
Open datasheet ↗
EVSE product lifecycle
Match development, production and field tasks to the appropriate test system.
Open overview ↗Watch and learn
Webinars and application videos
Explore charging development, interoperability, BMS testing and work at installed charging stations.
Engineering webinars

Bring your BMS to market faster
Connect BMS requirements, validation and traceable test results.
Open webinar ↗
Isolate charging interoperability failures
Connect field recordings with a focused laboratory investigation.
Open webinar ↗
Master the development of DC charging stations
Explore DC EVSE development challenges and practical validation methods.
Open webinar ↗
Is the charging station safe and fully functional?
Standards and practical methods for EVSE commissioning and field inspection.
Open webinar ↗Six perspectives on practical testing

EV testing
Explore the vehicle-side test application with comemso.
Watch video ↗
EVSE testing
See the EVSE test direction with a simulated vehicle.
Watch video ↗
Charging interoperability
Follow the interaction between a real vehicle and charging station.
Watch video ↗
BMS testing with BCS Compact
Discover the Battery Simulator Compact for BMS testing.
Watch video ↗
Calimera: mobile EVSE calibration
See the mobile charging-station calibration application.
Watch video ↗
Easy Chester Ultimate in use
See guided operation for EVSE field testing.
Watch video ↗Customer video: TÜV Austria — certification and EMC testing →
Search and filter
Find the resource by engineering context.
Use content type and topic to reduce the catalogue. Archive documents remain hidden until explicitly included.
EVSE product lifecycle
Match development, production and field tasks to the appropriate test system.
- Language
- English
- Format
- Document
- Overview
MCS technical datasheet
Review the dedicated MCS system and its technical configuration.
- Language
- English
- Format
- Document
- Datasheet
EMC Link
Connect supported charging signals across the EMC chamber boundary.
- Language
- English
- Format
- Document
- Brochure
Easy Chester Ultimate
Explore guided charging and electrical-safety tests in one field workflow.
- Language
- English
- Format
- Document
- Brochure
EV Charging Analyzer
Explore the EVCA platform for EV, EVSE and interoperability testing.
- Language
- English
- Format
- Document
- Brochure
EVCA ComOnly
Review the communication tester for EVCC and SECC development.
- Language
- English
- Format
- Document
- Brochure
Battery Cell Simulator
Compare cell, sensor, balancing and fault simulation for BMS testing.
- Language
- English
- Format
- Document
- Brochure
EVSE Inspection Guide
A compact field workflow for visual inspection, electrical safety, functional charging checks and documented results.
- Topic
- EVSE field testing
- Published
- 2026
- Format
- Web guide
EV charger uptime calculator
Estimate failure-derived availability, unavailable unit-hours, onsite service cost, repeat visits and a transparent improvement scenario.
- Topic
- EVSE operations and service
- Published
- 2026
- Format
- Interactive calculator
BMS testing whitepaper
Application-oriented introduction to BMS validation environments, battery-cell simulation and repeatable test depth.
- Topic
- BMS
- Published
- Current
- Format
- Whitepaper
comemso e-learning portal
Structured product and application training for customers who need repeatable operating knowledge beyond a brochure.
- Topic
- Products and applications
- Published
- Current
- Format
- Online learning
Test-system configurator
Start with DUT (device under test), test role, interfaces, power, automation and evidence before selecting the hardware architecture.
- Topic
- System planning
- Published
- Current
- Format
- Interactive web tool
Commissioning and inspection of charging stations
Summary of the practical live session on charging functionality, electrical safety and field inspection methods.
- Topic
- EVSE field testing
- Published
- 2026-04-21
- Format
- Event summary
CMI brings charging-station calibration into the field
How the Czech Metrology Institute integrated Easy Chester Calimera into a mobile AC and DC calibration workflow.
- Topic
- Calibration
- Published
- 2026
- Format
- Web article
SmartCal for Battery Cell Simulator systems
Guided calibration and adjustment of Battery Cell Simulator channels with attributable laboratory evidence.
- Topic
- BMS calibration
- Published
- 2026
- Format
- Web article
EMC Link during active EMC testing
Why charging-interface signals and communication must remain observable while electromagnetic stress is active.
- Topic
- EMC
- Published
- 2026
- Format
- Web article
MCS-ready EV and EVSE high-power testing
A high-power test architecture that combines established charging interfaces with an expansion route for MCS.
- Topic
- MCS
- Published
- 2026
- Format
- Web article
comframe Release 1.0
The transition from beta to a shared software environment for measurement, simulation, automation and evidence.
- Topic
- Software
- Published
- 2025
- Format
- Web article
CharIN MCS Controller Testival Europe
Technical context from early MCS interoperability work and comemso participation in the controller Testival.
- Topic
- MCS interoperability
- Published
- 2025
- Format
- Web article
Battery Cell Simulator Compact flyer
Dated document for a compact BCS configuration. Use current product documentation for new specifications.
- Topic
- BMS
- Published
- 2022-04
- Format
NTCS-1800 flyer
Dated information on NTC sensor simulation. Confirm current availability and configuration before use.
- Topic
- BMS
- Published
- 2022-04
- Format
R_ISOCheck flyer
Dated information on isolation-resistance test functions. Current scope is defined by the released system configuration.
- Topic
- BMS
- Published
- 2022-04
- Format
Fault Simulation Unit flyer
Dated information on BMS fault simulation. Use current product and quotation data for a new test bench.
- Topic
- BMS
- Published
- 2022-04
- Format
EVCA Multi Mobile brochure
Historical view of portable EV, EVSE and real-pair charging analysis at the document publication date.
- Topic
- EV and EVSE
- Published
- 2022-04
- Format
EVCA platform brochure 2023
Historical EVCA portfolio overview. It does not replace the current platform brochure or a project quotation.
- Topic
- EV and EVSE
- Published
- 2023-03
- Format
350 kW EVCA reference flyer
Dated high-power reference configuration retained for existing-system and historical project context.
- Topic
- High-power EVSE
- Published
- 2020 reference
- Format
CHAdeMO Analyzer/Simulator flyer
Historical CHAdeMO analyzer and simulator information. Confirm current hardware, protocol and licence scope.
- Topic
- CHAdeMO
- Published
- 2022-04
- Format
DC China Analyzer/Simulator flyer
Historical GB/T DC analyzer and simulator information. Confirm the current system release and standards scope.
- Topic
- GB/T DC
- Published
- 2022-04
- Format
Easy Chester Calimera
Explore charging-station calibration under load in the field.
- Language
- English
- Format
- Document
- Brochure
Easy Chester Ultimate technical datasheet
Check interfaces, measurements, test options and operating conditions.
- Language
- English
- Format
- Document
- Rev. 01.02
Bring your BMS to market faster
Connect BMS requirements, validation and traceable test results.
Open webinar ↗Isolate charging interoperability failures
Connect field recordings with a focused laboratory investigation.
Open webinar ↗Master the development of DC charging stations
Explore DC EVSE development challenges and practical validation methods.
Open webinar ↗Is the charging station safe and fully functional?
Standards and practical methods for EVSE commissioning and field inspection.
Open webinar ↗EV testing
Explore the vehicle-side test application with comemso.
Watch video ↗EVSE testing
See the EVSE test direction with a simulated vehicle.
Watch video ↗Charging interoperability
Follow the interaction between a real vehicle and charging station.
Watch video ↗BMS testing with BCS Compact
Discover the Battery Simulator Compact for BMS testing.
Watch video ↗Calimera: mobile EVSE calibration
See the mobile charging-station calibration application.
Watch video ↗Easy Chester Ultimate in use
See guided operation for EVSE field testing.
Watch video ↗No matching resource
Reset the filters or use a broader product, application or content term.
Use the right version
A resource informs the decision. The released scope defines the system.
Public documents explain product families and engineering methods. They do not replace the project quotation, released software documentation, calibration scope or the exact configuration delivered to a customer.
Check the date and status
Current, on-demand, event archive and archive are deliberately separated.
Confirm the application
Match the DUT role, charging interface, power level, software and evidence requirement.
Verify the released scope
Use the current quotation, release notes and project documentation for the binding configuration.
Continue with the engineering task
Move from information to executable testing.
Explore the relevant product configuration, applicable standards and released Test Libraries for your testing task.
FAQ
Using technical resources responsibly.
Publication date, application context and released scope determine how far a document can support an engineering decision.
What belongs in the Resources Library?
Find product documents, practical guides, checklists, webinars, interactive tools, technical articles and labelled archive documents. Explore the linked product and standards information for further detail.
How can I tell whether a document is current?
Each item shows a publication date and lifecycle status. A current public document is the document presently exposed through the official product or download route. The released quotation, software version and project documentation remain decisive for an ordered system.
Are brochures binding product specifications?
No. Brochures explain product families and typical configurations. The project quotation, released technical documentation and agreed scope define the delivered system.
Why does the library retain archive documents?
Archive documents help teams support installed systems and understand historical project context. They are hidden by default and carry a warning not to use them as the specification for a new system.
Continue from technical context
Turn the information into the next engineering decision.
Continue to the relevant application, current product scope or responsible comemso team.
Request an engineering guide.
Choose the BMS whitepaper or the EVSE Inspection Guide and complete the email verification.