Applications
Products
Software
Knowledge
Company
Engineer testing a charging station with comemso EV simulation and high-power laboratory equipment

For EVSE manufacturers

Release every charger firmware with evidence.

Every firmware update can break a charging session that worked yesterday. comemso test systems repeat the same sessions in development, verification, production and field service – each stage with the system that fits it.1

CharIN CCTS validated: Basic and Extended DC EVSE test profiles.

In 30 seconds
What for
Charger manufacturers who release firmware for AC and DC charging stations.
What it does
One test path from controller development to field service. The charging sessions you define once run again after every update.
Not for
Replacing formal certification – the test results prepare it.

One test path for every firmware release

From the first controller to the installed charger

Each stage answers a different release question. The charging sessions defined in development run again in verification, production and field service.

  1. 1
    Development

    Charging communication on the bench: EV simulation, protocol analysis and communication development without full-power equipment.

    EVCA ComOnly
  2. 2
    Verification

    Communication, signals, power integration, fault simulation and conformance on the complete charging station. CharIN CCTS validated for the Basic and Extended DC EVSE test profiles.

    EVCA Flex, IEC 61851-23:2023, CharIN CCTS
  3. 3
    Production

    Repeatable end-of-line tests with functional checks, parameter verification and traceable results for each unit.

    Easy Chester EOL
  4. 4
    Field

    Commissioning, maintenance and service with electrical safety checks, charging-function tests and guided reports. EVCA Interop records a real vehicle–charger pair when a field case occurs.

    Easy Chester Ultimate, EVCA Interop
  5. 5
    Certification

    Defined test cases, standard editions, DUT roles, verdicts and reports prepare formal certification. They do not replace it.

    Test Libraries
EVSE product lifecycle overview: seven stages from design and type testing to service and maintenance, each with the matching comemso product family. English graphic.
The complete EVSE product lifecycle with the matching comemso systems. Open PDF · EN · 1 page
Used in EVSE development and certification

“Thanks to the use of your equipment, we have achieved excellent results in our validation and certification process. Their quality and performance have exceeded our expectations.”

Anssony PerezEV Test & Validation Engineer, FlooxChargers, S.L. by Premium PSU

“Currently the best and most complete vehicle simulator / sniffer / man in the middle we have used.”

Montagna GiampieroHead of Digital Lab, KEMA Labs

Anonymised project example · EVSE manufacturer
For an expansion of its test equipment, an EVSE manufacturer selected EVCA Multi Mobile, EVCA Flex with IEC 61851-23 test capability and EVCA MCS. Read how the decision was made · All customer references

Frequently asked questions

EVSE manufacturers

Which comemso system fits which stage of charger development?

EVCA ComOnly covers communication development on the bench. EVCA Flex adds signals, power, fault simulation and conformance on the complete charging station. Easy Chester EOL tests each unit in production, Easy Chester Ultimate supports commissioning and service, and EVCA Interop investigates a real vehicle–charger pair.

Does testing with comemso replace certification?

No. Test Libraries and the CharIN CCTS validated DC EVSE test profiles prepare formal certification; they do not replace it.

How does a project start?

With a 15-minute demo: an engineer shows your charger test case on a real EVCA system. The written quotation then covers EV simulation, power equipment, Test Libraries and integration for your task.

For EVSE manufacturers

Plan the test path for your next firmware release

Test system and power equipment follow your development stage, vehicle behaviour, communication checks and fault cases.

From the demo to your first test:

  1. 15-minute demo. An engineer shows your charger test case on a real EVCA system.
  2. Written quotation. EV simulation, power equipment, Test Libraries and integration for your task – then you order.
  3. Delivery and start. Commissioning and training are agreed in the quotation.

Technical updates from comemso

Choose your newsletter topics

Receive product and software updates, practical testing insights and invitations to comemso events.

Choose my newsletter topics

Choose your topics, then confirm your subscription by email. Unsubscribe at any time.

¹ Scope

Functions, charging standards, interfaces, power ratings and Test Libraries depend on the EVCA system, the software release and your project configuration. Automated standards analysis supports, but does not replace, formal conformance testing. The quotation confirms the scope for your project.