Applications
Products
Software
Knowledge
Company

North America

How do you test NACS (SAE J3400) charging communication?

Define whether the vehicle or charging station is the device under test, then agree the interface, protocol and edition used by the project. Exercise connection, negotiation, charging states and supported faults while recording communication and electrical responses together. A NACS coupler designation alone does not identify every application-layer test case or the tests it needs.

Test area and results

Test areaWhat to define or record
SAE J3400SAE J3400_202409, revised September 30, 2024. Coupler requirements for DC or single-phase AC; identify the edition and operating mode in the recipe.
Coupler and adaptersConfirm physical interface, ratings and adapter scope.
CommunicationDefine protocol profile, operating modes, message sequence and timing.
Vehicle DUTSimulate the charging station and observe the vehicle response.
Station DUTSimulate the vehicle and observe the station response.

SAE J3400_202409 covers physical, electrical, functional, safety and performance requirements for a coupler supporting DC or single-phase AC. Use the actual protocol/service and selected edition to define communication cases. [1] SAE J3400_202409 scope and edition

A repeatable test workflow

  1. Define the connector path. Record inlet, cable, coupler and any adapter, together with ratings and the applicable J3400-family documents. Keep AC and DC operating modes distinct.
  2. Choose the DUT and communication profile. Select station or vehicle as the DUT. Record protocol, supported services and authentication mode instead of inferring them from the connector name.
  3. Establish a mode-specific baseline. Run connection, negotiation, charging and stop with the agreed counterpart. Capture signals, messages and available electrical measurements.
  4. Exercise interface boundaries. Use the configured supported limit changes and interruptions. Where an adapter is included, record its identity and verify the approved connection and operating conditions.
  5. Review the results by layer. Separate coupler/adapter evidence, communication verdicts and power/safety results. Identify which layers and operating modes were actually executed.

Define the acceptance records

CheckEvidence for the verdict
Mode and protocolAC/DC mode, protocol and service selection are present in the report.
Interface identityThe actual coupler, inlet, cable and adapter identifiers match the test record.
Correlated responseRequested limits, signal states and measured response agree for the executed case.
Coverage statementThe conclusion identifies communication, power and mechanical/safety scopes separately.

North American test path: document, test and setup

A NACS project usually touches several documents at once: the coupler, the signalling, the DC communication and, where vehicles with other inlets must charge, the adapter. Each verdict should name its document and edition. Clause references follow the edition agreed for the project and belong in the test plan.

TestDocument and editionWhat it coversDUT rolecomemso setup
Coupler and operating modeSAE J3400_202409Physical, electrical, functional, safety and performance requirements for the NACS coupler, for DC or single-phase AC.Vehicle inlet or station connectorEVCA Flex or EVCA Multi Mobile with NACS interface in the lab; Easy Chester Ultimate with NACS connection for installed stations, by configuration.
Control pilot and AC chargingSAE J1772_202401Conductive charge coupler and control-pilot signalling of the J1772 interface.Vehicle or stationEVCA ComOnly for controller communication without power; EVCA Flex with power.
DC charging communicationSAE J2847/2_202309; DIN 70121; ISO 15118-2; ISO 15118-20Messages between vehicle and off-board DC charger over powerline communication on the pilot line (J2847/2, for the J1772 coupler); DIN 70121 and ISO 15118 define the high-level communication profiles.Vehicle (EVCC) or station (SECC)EVCA ComOnly for communication without power, EVCA Flex with power, released Test Libraries for the profile in use.
Adapter between NACS and J1772/CCS1SAE J3400/1 (April 2025); ANSI/CAN/UL 2252:2025J3400/1: adapter safety and OEM-qualified designation; this edition covers adapters between SAE J3400 and SAE J1772. UL 2252: product safety of adapters for EV couplers.The adapter as part of the interface pathEVCA records the direct and the adapted path under the same conditions. Certifying the adapter is a laboratory scope, not a comemso test.
Installed charging pointNEC Article 625; in Canada CEC Part I, Section 86Installation requirements for EV charging systems, as adopted locally.Installed stationEasy Chester Ultimate for configured AC/DC field checks – see UL standards and EVSE field safety.

For adapters, CharIN recommends using only UL 2252-certified and/or OEM-approved adapters. [2] CharIN statement on SAE J3400/SAE J1772 adapters, 15 April 2025

Testing in North America

Customer project, April 2026: EV testing in the USA

A customer in the USA uses EVCA Flex with an integrated bidirectional DC CCS power circuit to test how vehicles respond to unexpected charging messages and delayed replies. The circuit provides 30 kW, with up to 1,000 V and up to 80 A within that envelope; Man-in-the-Middle with Sniffer adds the analysis of real charging sessions. Read the project

Contact in North America

comemso North America Corporation, 32000 Northwestern Highway, Suite 150, Farmington Hills, MI 48334 · +1 (248) 970-2420 (Eastern Time). The team provides direct sales, application engineering and support for North American projects; the systems are developed and built in Ostfildern, Germany.

Fault examples and diagnostic checks

Connector fits, negotiation fails

Compare protocol/services and physical communication setup before treating the mechanical connection as proof of compatibility.

Adapter-specific interruption

Compare a direct path and the approved adapter path under the same conditions, including signals and contact behaviour.

AC result reused for DC

Check that the report contains the operating mode and corresponding executed method before reusing its verdict.

Practical tip. Name the operating mode and communication profile in every saved recipe. “NACS test” alone does not identify the tested electrical and protocol behaviour.

Identify the interface and test role

Keep the mechanical interface, electrical operating mode and communication profile as separate configuration fields. For a station DUT, discuss the configured EVCA ComOnly or EVCA Flex vehicle simulation. For a vehicle DUT, discuss the configured charging-station simulation and power equipment. Confirm the NACS interface and released library before selecting the cases. A saved recipe should identify adapters, firmware and the source requirement so that a later test uses comparable conditions.

Questions about this test scope

Is NACS only DC?

The SAE J3400 scope includes AC single-phase and DC energy transfer. The selected test configuration determines which modes are covered.

Can I test without a real vehicle?

For a station DUT, a configured vehicle simulator provides the counterpart. Interfaces, protocol features and power equipment must match the required cases.

Does ComOnly replace a power source or load?

Communication-only testing and high-power energy transfer are different scopes. Agree the power setup separately.

Are adapters part of the test scope?

Identify the actual adapter, ratings and applicable requirements. A connector name alone does not establish adapter suitability.

Which edition should the report state?

State the exact normative edition, protocol profile, firmware and test-library version agreed for the project.

Why keep adapter identity in the trace report?

The adapter is part of the actual interface path. Its identity and approved use conditions are needed to reproduce a connection-specific result.

How should I compare direct and adapted charging?

Keep firmware, profile and operating conditions fixed, and compare the first changed signal, message or electrical response.

Can a communication verdict cover the coupler’s mechanical requirements?

Record those requirements and their evidence separately from message and signal results.

Sources and further reading

Share this article

LinkedIn