A power provider uses a 350 kW, 600 A CCS test configuration to investigate charging stations before deployment.

System of the Month September 2025: CCS EVSE validation before deployment

The configuration

  • 350 kW CCS configuration
  • Up to 600 A
  • Controlled fault tests
  • Two climate-controlled racks

The deployment task

The customer wanted to examine charging behaviour and fault responses before charging stations entered service. Identifying problems in a controlled setup reduces the need to investigate them only after deployment.

The system

The EVCA configuration combines charging communication, electrical measurement and controlled faults. Two climate-controlled racks house the selected test equipment.

The test objective

The team can repeat normal and challenging charging conditions before rollout. Power, current and interface limits remain specific to this installation.