comframe 1.1: simulation, gateway and end-of-line testing

The July 2025 comframe release added more control over protocol simulation, bidirectional message manipulation and AC/DC end-of-line testing.

comframe 1.1: simulation, gateway and end-of-line testing

Vary message timing in simulation

In comframe 1.1, vary message timing and timeouts, and send additional messages to test the robustness of the communication state machine. Apply these changes in the simulation workflow with the simulated charging counterpart.

Manipulate messages between real EV and EVSE

Use Manipulating Gateway to change DIN 70121 and ISO 15118-2 messages in both directions between a connected real EV and EVSE.

Define in engineering, execute in production

The release added Expert and Production modes for AC and DC end-of-line testing. Choose the mode for your production task and match the test functions to the system, software release and licence.